Qingdao Tianhua Yihe Foundry Factory is one of the leading manufacturers and suppliers of Welded Conveyor Machine Frame Assembly | Sectional, Match-Marked in China. We have world-leading production equipment and strong manufacturing capabilities. Please feel free to buy high quality customized products at competitive price from our factory.
Picture the install crew on day one: forty conveyor sections on the ground, a crane booked for two days, and a general arrangement drawing in a plastic sleeve. If the sections are not numbered, if the flanges do not meet flush, or if the idler stations drift a few millimetres per section, that crane booking gets extended. A welded conveyor frame is judged on site, not in the factory.
We fabricate conveyor stringers, truss sections, head and tail frames and drive frames for material handling and packaging machinery builders who design their own lines. For more than two decades our job has been the same: take the customer's drawing, check it for manufacturing problems, and deliver sections that bolt together the way the designer intended.
Splitting a long line into sections
Most lines are too long to ship in one piece, so the first decision is where to split. Section length is usually driven by truck or container size, by crane capacity on site, and by where support legs fall. If you send the general arrangement, we can propose a split for your approval that loads containers efficiently. Each joint gets a bolted end flange, and each section gets a welded steel tag with section number, project number and belt direction.
Fixtures and idler pitch on a welded conveyor frame
Repeatability comes from fixtures, not from careful measuring of every station. For a conveyor frame order we build a fixture that holds the stringers at the right spacing and locates every idler bracket, skirt rail mount and guard clip from one datum. The pitch is then the same on section one and section forty.
Flange joints are where many frames go wrong. A flange welded square on the bench can pull out of square once the stringer welds cool. Where the drawing calls for it, we mill the flange faces after welding in our own machine shop, and corner holes can be reamed for fitted bolts that locate the sections while standard bolts clamp them.
Galvanized or painted?
| Hot-dip galvanized | Primer and paint | |
|---|---|---|
| Typical use | Outdoor, wet or bulk handling | Indoor plants, packaging lines |
| Design detail needed | Vent and drain holes in all closed sections | Seal-welded or capped tube ends |
| Effect on fit | Zinc build-up in holes, may need re-tapping | Minimal |
| Who does it | Qualified galvanizing partner, inspected by us | Qualified paint partner, inspected by us |
We do not galvanize or paint in-house. Both are handled by finishing partners we have worked with for years, and we inspect coating thickness and appearance before packing.
Inspection before the sections leave
- Length, diagonals and straightness of each section checked on the fixture
- Idler and bracket pitch checked against the drawing
- Flange hole patterns checked so adjacent sections match
- Trial assembly of two or three adjacent sections on request
- Section tags checked against the packing list
Packing for export
Sections are nested where their shape allows, separated with timber, strapped to skids and loaded so the crane crew can lift them in assembly order. Loose parts such as shim packs, fitted bolts and small brackets are bagged and labelled by section.
Supports, walkways and the rest of the structure
A conveyor line also needs legs, cross bracing, walkways, handrail posts, guards and drive platforms. These can be built from the same drawings set and drilled to the same coordinates as the welded conveyor frame, which saves a lot of site drilling. Tell us which items you want to source from us and which come from elsewhere, and we will make sure the interfaces are dimensioned and checked. Small items are packed by section so the crew finds them where they are needed.
Conveyor frame questions
Can you suggest section lengths?
Yes. Send the general arrangement and your transport limits and we will propose a split for your approval.
Do you supply the idlers and belt?
No. We build the steel frame and welded supports. Idlers, belts and drives come from your usual suppliers.
Can related parts be built to the same coordinates?
Yes. Transfer chutes, take-up frames and drive frames from the same project can be drilled to one datum so they meet on site.
How soon can we see a first section?
A prototype section usually takes 5-7 days after drawing approval; full projects run 20-30 days depending on quantity.
Ready to price a line? Send the GA and section drawings and an engineer will reply. You may also need our conveyor take-up frames or our general conveyor frame and support work.
Picture the install crew on day one: forty conveyor sections on the ground, a crane booked for two days, and a general arrangement drawing in a plastic sleeve. If the sections are not numbered, if the flanges do not meet flush, or if the idler stations drift a few millimetres per section, that crane booking gets extended. A welded conveyor frame is judged on site, not in the factory.
We fabricate conveyor stringers, truss sections, head and tail frames and drive frames for material handling and packaging machinery builders who design their own lines. For more than two decades our job has been the same: take the customer's drawing, check it for manufacturing problems, and deliver sections that bolt together the way the designer intended.
Splitting a long line into sections
Most lines are too long to ship in one piece, so the first decision is where to split. Section length is usually driven by truck or container size, by crane capacity on site, and by where support legs fall. If you send the general arrangement, we can propose a split for your approval that loads containers efficiently. Each joint gets a bolted end flange, and each section gets a welded steel tag with section number, project number and belt direction.
Fixtures and idler pitch on a welded conveyor frame
Repeatability comes from fixtures, not from careful measuring of every station. For a conveyor frame order we build a fixture that holds the stringers at the right spacing and locates every idler bracket, skirt rail mount and guard clip from one datum. The pitch is then the same on section one and section forty.
Flange joints are where many frames go wrong. A flange welded square on the bench can pull out of square once the stringer welds cool. Where the drawing calls for it, we mill the flange faces after welding in our own machine shop, and corner holes can be reamed for fitted bolts that locate the sections while standard bolts clamp them.
Galvanized or painted?
| Hot-dip galvanized | Primer and paint | |
|---|---|---|
| Typical use | Outdoor, wet or bulk handling | Indoor plants, packaging lines |
| Design detail needed | Vent and drain holes in all closed sections | Seal-welded or capped tube ends |
| Effect on fit | Zinc build-up in holes, may need re-tapping | Minimal |
| Who does it | Qualified galvanizing partner, inspected by us | Qualified paint partner, inspected by us |
We do not galvanize or paint in-house. Both are handled by finishing partners we have worked with for years, and we inspect coating thickness and appearance before packing.
Inspection before the sections leave
- Length, diagonals and straightness of each section checked on the fixture
- Idler and bracket pitch checked against the drawing
- Flange hole patterns checked so adjacent sections match
- Trial assembly of two or three adjacent sections on request
- Section tags checked against the packing list
Packing for export
Sections are nested where their shape allows, separated with timber, strapped to skids and loaded so the crane crew can lift them in assembly order. Loose parts such as shim packs, fitted bolts and small brackets are bagged and labelled by section.
Supports, walkways and the rest of the structure
A conveyor line also needs legs, cross bracing, walkways, handrail posts, guards and drive platforms. These can be built from the same drawings set and drilled to the same coordinates as the welded conveyor frame, which saves a lot of site drilling. Tell us which items you want to source from us and which come from elsewhere, and we will make sure the interfaces are dimensioned and checked. Small items are packed by section so the crew finds them where they are needed.
Conveyor frame questions
Can you suggest section lengths?
Yes. Send the general arrangement and your transport limits and we will propose a split for your approval.
Do you supply the idlers and belt?
No. We build the steel frame and welded supports. Idlers, belts and drives come from your usual suppliers.
Can related parts be built to the same coordinates?
Yes. Transfer chutes, take-up frames and drive frames from the same project can be drilled to one datum so they meet on site.
How soon can we see a first section?
A prototype section usually takes 5-7 days after drawing approval; full projects run 20-30 days depending on quantity.
Ready to price a line? Send the GA and section drawings and an engineer will reply. You may also need our conveyor take-up frames or our general conveyor frame and support work.