If you have sent the same bracket drawing to three Chinese fabricators and received three very different prices, the problem is rarely "China pricing." It is usually the RFQ. One shop priced a laser-cut blank. Another included bending, hardware, and powder coat. A third assumed a looser tolerance or EXW instead of delivered cost. Until the scope is written down, you are comparing guesses, not quotes. A unit price that excludes hardware, inspection, or export packing is not cheaper - it is unfinished.
This guide is for overseas buyers and engineers in the US and EU who source custom sheet metal fabrication, welding, and structural parts from China. It covers the drawing package, the details that change the price, and how to read the quotation you get back.
Ready with drawings? Upload your STEP, PDF, or DXF files for a custom sheet metal fabrication quote. Qingdao Tianhua Yihe Metal Fabrication will review the scope and reply with clarifying questions or a formal quotation.
What to Include in Your Drawing Package
3D CAD files: STEP, STP, or IGES
A 3D model is the fastest way to understand formed geometry, clearances, and assembly fit. STEP or STP is the usual CAD-neutral format for enclosures, bent brackets, and welded structural assemblies. The model shows shape, not critical dimensions, cosmetic faces, weld requirements, or which revision governs inspection.
2D drawings: PDF, DWG, and DXF
Send a dimensioned 2D PDF as the controlled drawing, with part number, revision, units (mm or inch), projection, material, thickness, general tolerance, critical dimensions, bend and weld notes, finish, and hardware callouts. Most export manufacturers will treat this PDF as the inspection authority unless you state otherwise. DWG or DXF files help with laser-cut profiles, flat patterns, and nesting. If you have a flat-pattern DXF, mark whether it is an approved manufacturing input or only a reference; if you do not, a clear PDF plus a STEP model is usually enough for quotation.
Make one revision the authority
Put the same part number and revision on the RFQ, the PDF, the STEP file, and any DXF or BOM. If the model and the drawing disagree, state which file governs inspection and retire superseded files. A practical OEM package is a STEP or STP model, a 2D PDF with title block and notes, a DXF or DWG if available, a BOM for assemblies, plus quantity, destination, and packing or inspection requirements. If you only have a PDF or a photo of a legacy part, send it and ask what still must be confirmed.
Specify Material and Thickness Precisely
"Stainless steel, 2 mm" is not a material specification. 304 and 316 weld and finish differently, and they do not cost the same. The same is true of "aluminum" versus 5052-H32 or 6061-T6, and of "mild steel" versus a named grade such as DC01, SPCC, or A36.
State the exact grade and temper where it matters; thickness in millimeters, even if the drawing also shows gauge; any approved substitutes, or a note that none are allowed; certification needs, such as an EN 10204 3.1 mill certificate, if required; and the cosmetic side, plus grain direction if a directional finish is required. Gauge thickness is not identical across material families, so add the mm equivalent in the title block.
Tolerances: Tighten What Matters, Not Everything
A drawing that tightens every dimension will inflate the quote and still fail to protect the features that actually fit. Start with a general standard in the title block, such as ISO 2768-mK for many formed parts, then add explicit tolerances only on mating holes, datums, envelope dimensions, sealing surfaces, or flatness on a mounting face.
Cut, bent, and welded features do not hold the same capability. Laser-cut holes can often be held tighter than bend-to-bend dimensions, and welded assemblies are looser still. For welded constructions, general tolerances are often referenced to EN ISO 13920 rather than ISO 2768. If a hole must stay accurate after forming or welding, say whether it is cut before forming, after forming, or machined later. Include first-article reports or material certificates in the RFQ so they are priced in.
Bends, Welds, Hardware, and Assemblies
Bends. Show bend lines, angles, and direction, and note whether a dimension is inside or outside. If you have a required inside radius, state it. A common DFM starting point is an inside radius at least equal to material thickness.
Welds. "Welded" is not a specification. Say whether a joint is cosmetic, structural, or required to be sealed, and include symbols or notes for size, length, visible-side requirements, and post-weld finishing.
Hardware and assembly. List inserts, standoffs, rivet nuts, hinges, and gaskets by manufacturer part number or a clear equivalent. State who supplies the hardware and whether the quote should include assembly or only loose components.
Surface Finish and Cosmetic Faces
"Powder coated" or "anodized" leaves color, gloss, texture, film thickness, and masking undefined. Specify the process (powder coating, wet paint, zinc plating, anodizing, brushing, polishing, passivation, or bare with a protective film); a color code such as a RAL number, plus gloss or texture; film thickness if required; visible faces and masked areas; grounding points or threads that must stay uncoated; and burr limits on appearance surfaces. If color match is critical, a photo or approved sample is more useful than "good appearance." State whether finish is applied before or after welding and hardware installation. For process options, see surface finishing capabilities.
Quantity, MOQ, and Lead Time
Quantity changes the manufacturing route, not only the unit price. A five-piece prototype may be laser cut and CNC bent; the same part at several thousand pieces a year may justify hard tooling or a dedicated fixture. Give the supplier prototype quantity, first production batch, and expected annual volume or price breaks (for example 50 / 200 / 1,000), even if later numbers are forecasts.
Minimum order quantity for custom sheet metal from China is not a single industry number. Many export shops will quote a single prototype for laser cutting and bending. MOQ rises when material has a mill minimum, when finishing is priced by batch, or when tools or fixtures must be amortized. Ask the supplier to state MOQ, one-time charges, and whether tooling is paid once or absorbed into the unit price.
A professional quotation states lead time in working days and the starting point: after drawing approval, after deposit, or after material arrival. At Qingdao Tianhua Yihe Metal Fabrication, prototypes typically take 5–7 days and production orders 20–30 days, depending on complexity and quantity; the exact figure is confirmed on your quotation. State any on-dock date and freight mode in your RFQ.
Packaging, Destination, and Commercial Terms
Tell the factory the destination country, and the city or port if freight should be included; the preferred Incoterm, such as EXW, FOB, CIF, DAP, or DDP; packing details such as protective film, separators, cartons, pallets, and labels; and any documents needed for customs or your quality system. An attractive EXW number can look expensive once inland trucking and last-mile delivery are added, so ask every bidder to quote the same term, or to split the ex-works price and the freight. Also require a validity period; metal prices move, and a quote with no expiry is incomplete.
How to Read the Quotation You Get Back
Judge the quote as a scope document, not as a single unit price. Check that it repeats your part number and revision, material grade and thickness, finish, quantity breaks, and the processes included. Setup, programming, and tooling should appear as one-time charges. Hardware, finishing, inspection, and packing should be marked included or excluded, and lead time, validity, payment terms, and Incoterms should be explicit.
Read the exclusions line closely. "Excludes hardware" or "excludes export crating" are real costs, as are assumed tolerance relaxations or material substitutions. A supplier who lists assumptions and asks DFM questions is usually protecting both sides; one who prices a new, tight-tolerance assembly with no questions is the riskier choice, even if the number is lower. If quality evidence matters, ask what is available - for example ISO 9001-certified, a sample first-article format, or a material certificate - and confirm it is in the quoted scope.
Sheet Metal RFQ Checklist
Use this list before you send files. If an item does not apply, say so.
- Part number, description, and current revision on every file
- Units, projection method, and a clear title block
- STEP/STP (or IGES) model, plus a 2D PDF drawing
- DXF or DWG cut profile or flat pattern, if you have one
- Material grade, temper if relevant, and thickness in mm
- General tolerance standard, plus critical dimensions and datums
- Bend directions, angles, and inside or outside dimensions
- Weld type and visible-joint requirements, if any
- Hardware list and assembly scope
- Finish process, color code, visible faces, and masking
- Prototype quantity, first batch, and annual or break quantities
- Inspection, certificates, packing, destination, Incoterm, and target date
Need a price on a defined scope? Send your drawings for a sheet metal fabrication quote. An incomplete package is still a starting point; a technical review is faster than a week of clarifying email.
Upload Your Drawings and Request a Quote
If you are ready to source custom sheet metal parts, welded assemblies, or structural components from China, send the current drawing package. Qingdao Tianhua Yihe Metal Fabrication reviews incoming RFQs for manufacturability and scope before a price is issued.
Upload your drawings (STEP, PDF, DWG, or DXF) and request a custom sheet metal fabrication quote. Include quantity, material, finish, and destination if you have them - or send the files and note the open items.
FAQ
What files do I need for a custom sheet metal fabrication quote?
Send a STEP or STP 3D model, a dimensioned 2D PDF with the current revision, and a DXF or DWG if you have a flat pattern or cut profile. Add material, thickness, quantity, finish, and weld or hardware notes. A PDF or photo of an existing part is enough to start.
Can a supplier quote accurately from a STEP file alone?
A STEP file is excellent for shape, but it usually lacks tolerances, revision control, finish, weld requirements, and inspection notes. Many shops can issue a budgetary figure from a model and quantity, then firm the price once a 2D PDF is available. Include that drawing for a production quote, and state which file governs if the files differ.
What is the typical MOQ for custom sheet metal parts from China?
There is no single MOQ. Laser-cut and CNC-bent parts are often quoted from one prototype upward. Minimums are more likely when material has a mill minimum, finishing is priced by batch, or tools must be built. Give prototype, first-batch, and annual quantities so MOQ and tooling can be stated separately.
How long does quoting and production usually take?
A complete RFQ for a straightforward bracket or panel is often turned around in about one business day; new welded assemblies commonly take several working days. At Qingdao Tianhua Yihe Metal Fabrication, prototypes (from 1 piece) typically take 5–7 days and production orders 20–30 days, depending on complexity and quantity, confirmed in writing on the quotation.
Which tolerances should I put on the drawing?
Use a general standard, such as ISO 2768-mK, for ordinary dimensions, and apply tighter tolerances only to functional features such as mating holes, datums, sealing faces, or envelope dimensions. Do not apply machining-level tolerances to every bend. Say whether a tight hole is cut before forming, after forming, or machined.
How should I compare quotes from different Chinese fabricators?
Do not rank quotes by unit price alone. Confirm that each bidder priced the same revision, grade, thickness, finish, hardware, inspection, packing, and Incoterm. Look for itemized setup and tooling, a validity period, and an exclusions list. Prefer the supplier who returns specific DFM questions over one who prices a complex new part with no questions.






